Physical Location: This renovation to expand pediatric specialty services will take place at Dartmouth Hitchcock Clinics Manchester. Physical address is 100 Hitchcock Way, Manchester, NH. The Clinic is a two story building within a wooded setting that offers adult and pediatric services in primary care, multi-specialty, urgent care, laboratory, imaging, ambulatory surgery, and medical infusion services. Description of Scope: The scope will only include interior building renovations and equipment for the children’s wing of the Manchester clinic. There will be no impacts to the external building nor the surrounding space of the building. Construction will include some interior wall destruction, construction, flooring, painting, and several work space improvements that involve renovations. This will create new clinical patient care rooms, clinical work areas improved soiled work room and clean supply room, and new patient reception and exiting location in the existing waiting room. The HRSA grant budget of $1,000,000 will be dedicated to the architectural and engineering designs and construction costs as noted in the budget SF424C form. Project Activity Specifications: The project will include 2,700 square feet of renovated space. The impacted rooms are noted in the floor plan representing: 4 patient care rooms, 2 patient consultation rooms, 2 team work rooms, clean/dirty/storage rooms, 4 support offices, and reception/waiting room. The renovations and relocations will result in an additional 8,000 pediatric specialty patient visits annually. Type of Construction: This project includes architectural space design, interior demolition, construction and modernization of existing interior spaces. Procurement will be construction management and construction type is industry standard, commercial grade medical office construction. Timeline: Planning: 1 month Design: 2 months Obtaining required permits and/or variances: 1 month Meeting Fede
ral environmental and historic preservation requirements: Not applicable. Solicitation of bids and awarding of contracts: 2 months Material Procurement period: 6 months Alteration/renovation construction period: 6 months Expected project completion date: November 2023 Equipment List (if applicable): Not applicable. Construction related costs only included in $1M budget.